CASE STUDY

Wellington Airport Control Tower 

Wellington Airport welcomed a new state-of-the-art air traffic control tower in August 2018, designed to handle the airport’s demanding operations with over 97,000 flights annually. Standing 32 metres tall, the tower provides panoramic views across the airfield, ensuring air traffic controllers have optimal visibility to manage air traffic safely and efficiently.

This iconic structure is one of New Zealand’s safest buildings, meeting 100% of the building code for its importance level. The tower’s base includes 13 advanced base isolators to deliver superior earthquake resilience, a critical feature in Wellington’s seismic environment.

Wellington Airport Control Tower

KOROK® Systems for Lift Shafts, Risers, and Ducts

KOROK® was proud to contribute to this project, supplying 78mm fire-rated acoustic panels for the lift shafts, risers, and ducts. Our systems are specifically designed to streamline construction and improve safety on site. By allowing installation from just one side, scaffolding inside the shaft is not required, reducing both construction time and costs.

Our panels offer superior fire resistance, acoustic performance, and seismic resilience, making them the ideal solution for high-importance structures like the Wellington Airport control tower.

Why KOROK®?

  • Efficient Installation: No need for internal scaffolding, speeding up project timelines.
  • Superior Fire Protection: KOROK® systems ensure compliance with fire safety regulations.
  • Acoustic Performance: Helps to minimize noise pollution in critical areas like lift shafts and risers.
  • Seismic Resilience: Engineered for enhanced stability in earthquake-prone zones.

The Wellington Airport control tower is a landmark project, showcasing KOROK®’s capabilities in delivering advanced, resilient building systems for critical infrastructure.

KOROK Systems used in this project

Lift Shafts, Risers, Ducts Fire and Acoustic Rated Protection

Lift Shafts, Risers, Ducts   

For lift shafts and duct walls, KOROK® offers significant advantages over traditional construction. As panels can be installed from one side only, there is no requirement to construct scaffolding inside the shaft, greatly reducing construction time and costs.

Related Projects